[Repost] The scale of the Engineering Building currently under construction at Chung-Ang University.jpg
No translation in your language yet — showing the English version
- Building Name: Chung-Ang University AX Engineering Building (Building 205)
- Construction Cost: Approx. 150 billion KRW
- Total Floor Area: 56,739.96㎡ (17,200 pyeong), 4 basement levels / 13 floors above ground
- Construction Period (Planned): April 2026 ~ 2028
Featuring views of the Han River:
Left: Yeouido,
Front: Yongsan, Seoul Station, Namsan,
Right: Seocho and Gangnam areas can be viewed.
.








0
Comments 0