Many of you who saw Part 1 might have been following the Ttowari-gul incident in Wonju with interest.
When I first heard that a 900 million won project suddenly jumped to 11.8 billion won, my first reaction was to curse, thinking, "There goes the local government wasting taxes again." However, I was shocked by Part 1, which revealed that the diagnosis from five years ago was a mere eyewash that ignored the 80-year-old accumulated tar. After watching Part 2 released today, things are even more appalling.
Once the construction began and high-pressure water trucks stripped away all that black tar, the true state of the tunnel was fully exposed. It turns out that massive cracks and spalling, covering an area of 18,256㎡, were spread throughout the entire tunnel. The humidity was as high as 99%, creating thick fog, and groundwater was pouring from the ceiling and walls like waterfalls. The finishing material, which people thought was paint, was soaking up water and oozing down like sewage sludge, and the concrete degradation depth was found to be over 6cm.
The media and some critics are questioning, "If the consulting firm gave it a structural Grade A, why all this fuss?" But that "Grade A" simply meant it was safe because it was a decommissioned railway with only the skeleton remaining; it absolutely did not mean it was safe by the standards of an "exhibition hall" where multi-billion won high-tech media art equipment is installed to attract tourists.
If they had just applied a superficial coating and opened it in this state, it was obvious that a massive accident would have occurred later—either a fire caused by a short circuit or concrete chunks falling from a two-story high ceiling onto visitors' heads.
From the perspective of the technicians working on-site, scraping away sludge and getting drenched in water, changing the construction method and performing repairs was a natural necessity for safety. Yet, the media engaged in a witch hunt, claiming they were "inflating the budget" or "granting special favors."
I heard that in Part 3, they will expose the actual original documents, including the initial contract used by Wonju City, the amended contracts, and the rejected official documents, so we must watch how this unfolds until the end. For those who saw Part 1, if you skim through Part 2, everything will make perfect sense.
Here is the YouTube link for the Break News TV investigative report [Exclusive 2] The Truth Behind the 11.8 Billion Won Ttowari-gul: Who is Framing the Narrative? (Part 2).
Watch [Exclusive 2] The Truth Behind the 11.8 Billion Won Ttowari-gul (Part 2): https://www.youtube.com/watch?v=uI0ksmcc1vY