[Repost] The scale of the Engineering Building currently under construction at Chung-Ang University.jpg

Machine translated
  1. Building Name: Chung-Ang University AX Engineering Building (Building 205)
  2. Construction Cost: Approx. 150 billion KRW
  3. Total Floor Area: 56,739.96㎡ (17,200 pyeong), 4 basement levels / 13 floors above ground
  4. Construction Period (Planned): April 2026 ~ 2028
    Featuring views of the Han River:
    Left: Yeouido,
    Front: Yongsan, Seoul Station, Namsan,
    Right: Seocho and Gangnam areas can be viewed.
    .
    