Hello
I hired someone for interior construction before moving in,
but they are requesting additional fees every single day.
After replacing the toilet, while checking the drainage, a leak occurred in the unit below,
and they charged an extra 550,000 KRW to fix it.
They said after removing the living room ceiling light, a gap was left,
so they had to call a carpenter for finishing, resulting in an extra 600,000 KRW.
When installing the 3-burner induction cooktop, they claimed there was a risk of overloading the existing outlet,
so an extra 500,000 KRW was charged for wiring work.
Additional fees are being requested day after day; is it normally like this??